by hamel company | May 2, 2022 | Featured Projects
The simplicity of these before and after photos doesn’t do justice to the complexity of the project. This was a restaurant with complex finishes and required the organization of 10 different subtrades including, but not limited to, movers, flooring installers,...
by hamel company | May 2, 2022 | Featured Projects
A frozen sprinkler pipe on the 3rd floor of an apartment building caused a loss that affected 23 units 6 of which had displaced tenants. The loss had major impacts to common hallways and stairwells so all tenants in the building were affected. A project like this...
by hamel company | May 2, 2022 | Featured Projects
A leak in the roof while the insured was away caused extensive damage throughout the entire home. This project was unique because the insured didn’t want any changes to the existing surround speaker system throughout the home which was installed sometime in the 80’s....
by hamel company | May 2, 2022 | Featured Projects
The insured was away during winter when the furnace in the home failed leading to many frozen and burst pipes throughout the home. While the entire kitchen had to be rebuilt, we were able to save the solid wood cabinets by bringing them to a local craftsman who...
by hamel company | May 2, 2022 | Featured Projects
A fire on the fourth floor in a residential community completely destroyed the original unit pictured and set off sprinklers throughout the building which affected about 30 units. Contact Us...
by hamel company | May 2, 2022 | Featured Projects
Extensive damage originated from a tub overflow in the unit above this condo. Upon demolition of the damaged areas it was discovered that the building did not have the proper footings in place so they had to be repoured and the entire layout of the space had to be...