617-784-1841 info@hamelcompany.com

When a fourth floor water line burst in a commercial condo building during the early days of the COVID shutdown it took days before anyone realized it. By the time the leak had been discovered this second floor condo had been completely destroyed. The tenant was actively trying to cancel the lease so it was imperative that it be rebuilt within about 60 days – which it was. Thirty of those days were spent waiting on the building department to approve the rebuild which left a tight window for construction.